Were you hunting for info about How to Install a Bathtub?
Installing a tub isn't precisely brain surgery, however it does call for solid plumbing, woodworking, and often, tiling skills. Changing an old bath tub with a new one is additionally a moderately tough project. If the old tub is conveniently available, the task can move immediately; if you have to open a wall surface to remove the old tub and also position the brand-new bath tub, the task is a lot harder. In either case, the project is within a house handyman's abilities, although you will need an assistant to leave the old bathtub and set in the brand-new one. Make sure you have certified on your own for the work and are comfortable trying it. As opposed to hiring a specialist to take over a halfway-completed job, it is much better to take into consideration employing one before you begin. Opportunities are you might require a professional plumber to make tube connections.
This post will certainly aid you set up a brand-new bath tub in your washroom if you have actually currently bought a new tub as well as don't require to alter the plan of your previous water system pipelines.
Your tools as well as product checklist should comprise the following:
Removing Old Taps
If you need to replace old taps with new ones as a part of your installation, after that the first thing you need to do is separate the water system. After doing so, switch on the faucets to drain pipes any type of water remaining in the system. The process of eliminating the existing taps can be rather troublesome because of the restricted gain access to that is typically the case.
Use a basin wrench (crowsfoot spanner) or a tap device to reverse the nut that attaches the supply pipes to the faucets. Have a fabric prepared for the staying water that will come from the pipelines. As soon as the supply pipelines have been eliminated, use the same device to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to stop the solitary faucets from turning during this procedure. When the taps have been gotten rid of, the holes in the bath/basin will certainly need to be cleaned up of any kind of old securing compound.
Before moving on to fit the brand-new taps, compare the pipe links on the old taps to the new faucets. If the old faucets are longer than the brand-new faucets, after that a shank adapter is needed for the new taps to fit.
Suitable New Touches
If the tails of the new faucets are plastic, after that you will certainly need a plastic connector to stop damages to the thread. One end of the connector fits on the plastic tail of the faucet as well as the other end supplies a connection to the current supply pipes.
If you require to fit a monobloc, then you will certainly need reducing couplers, which links the 10mm pipe of the monobloc to the common 15mm supply pipeline.
Next, position the faucet in the installing opening in the bath/basin guaranteeing that the washing machines are in area between the faucet and the sink. Safeguard the tap in position with the maker provided backnut. As soon as the faucet is safely in position, the supply pipes can be attached to the tails of the taps. The faucets can either be connected by using corrugated copper piping or with regular tap adapters. The former type must be attached to the tap finishes first, tightening just by hand. The supply pipes can later be attached to the other end. Tighten up both ends with a spanner after both ends have actually been linked.
Setting up the Tub
Making use of the two wood boards under its feet, position the tub in the called for placement. The wooden boards are valuable in equally spreading the weight of the bath tub over the location of the boards instead of concentrating all the weight onto 4 little factors.
The next goal is to make sure that the bath tub is leveled all round. This can be achieved by checking the level and also adjusting the feet on the bathtub up until the level reviews level.
To mount taps, fit the bottom of the outermost adaptable tap connector to the suitable supply pipeline by making a compression sign up with; after that do the same for the other tap.
Activate the water supply and also examine all joints and new pipework for leaks as well as tighten them if essential. Load the bath tub as well as also check the overflow outlet and the typical electrical outlet for leaks.
Finally, repair the bathroom paneling as defined in the supplier's instruction manual. Tiling and sealing around the tub must wait up until the tub has been utilized a minimum of when as this will settle it into its final setting.
Getting ready for the Setup
To start with, the sustaining structure provided with the bathroom must be fitted (if called for) according to the supplier's guidelines. Next, fit the taps or mixer to the tub. When fitting the tap block, it is essential to make certain that if the faucet includes a plastic washer, it is fitted between the bath and the faucets. On a plastic bath, it is also sensible to fit a supporting plate under the taps unit to stop pressure on the bath tub.
Fit the adaptable tap ports to the bottom of the two faucets making use of 2 nuts and also olives (often provided with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink electrical outlet hole, and then pass the outlet via the hole in the bathroom. Utilize the nut supplied by the manufacturer to fit the plug-hole. Check out the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
Next, fit the end of the versatile overflow pipe to the overflow electrical outlet. After that, screw the pipeline to the overflow face which need to be fitted inside the bath. Make sure you make use of every one of the supplied washers.
Attach the catch to the bottom of the waste outlet on the bathtub by winding the string of the waste outlet with silicone mastic or PTFE tape, and screw on the trap to the electrical outlet. Attach the bottom of the overflow tube in a similar manner.The bathroom must now prepare to be suited its final placement.
Tiling Around the Tub
In the area where the bathroom meets the ceramic tile, it is necessary to secure the joins with a silicone rubber caulking. This is important as the installation can move enough to split a rigid seal, creating the water to permeate the wall in between the bath and also the tiling, causing issues with moisture and feasible leakages to the ceiling listed below.
You can choose from a selection of coloured sealants to blend in your components and installations. They are offered in tubes and cartridges, and are capable of sealing spaces up to a size of 3mm (1/8 inch). If you have a larger void to fill, you can load it with twists of drenched newspaper or soft rope. Keep in mind to constantly fill the bathtub with water prior to sealing, to permit the motion experienced when the tub remains in use. The sealer can break rather early if you do not take into account this motion before securing.
Alternatively, ceramic coving or quadrant ceramic tiles can be made use of to border the bath or shower tray. Plastic strips of coving, which are easy to use and cut to dimension, are likewise conveniently offered on the marketplace. It is recommended to fit the ceramic tiles using water-resistant or water-proof adhesive and grout.
How to Install or Replace a Bathtub
Find Your Dimensions
The first step in any bathtub installation or replacement is to select the right size tub for your bathroom. Start by measuring your existing bathtub’s alcove from wall to wall. The standard size for bathtubs is around 5 feet long and 30 or 32 inches wide. Purchase the size that’s closest to your previous tub.
After you’ve measured, you’ll need to figure out what type of tub you need. Face the alcove. If the drain is on the right-hand side, you’ll need a right drain tub. If it’s on the left, get a left drain tub. Easy enough, right?
Disconnect the Water Supply and Drain Assembly
Before you can start on your removal, make sure that you turn off the tub’s water supply. Some bathrooms have a shutoff valve, but if you don’t see one, you’ll need to turn off the supply at your house’s water main. Once the water’s off, open the valves to release any remaining air in the supply lines.
Then, disconnect the tub drain flange. This process varies based on the type of drain you have, but in most cases, you’ll need a drain flange removal tool to perform this task. If you’re feeling handy, you might be able to use a pair of needle-nose pliers to twist and pull the flange.
Now comes the fun part. In order to disconnect the drain assembly, you’ll need to be able to get to the space underneath the tub. You might need to access the tub drain from a crawlspace or a basement. Don’t forget to take a pipe wrench with you, as you’ll need it to loosen the pipe at the connection.
Cut Out the Old Tub
After removing the drainpipe assembly, you can take out the old bathtub. Cut a strip above the tub edge in the wall surrounding the bathtub that's about 6 inches in height. The tools you need here may vary depending on the type of wall surround you have in the alcove. If you’re cutting drywall, use a drywall saw and remove the section of the wall all the way down to the studs. If you have tile, you’ll need to use a grinder with a diamond blade to cut through the grout line. Then, use a chisel to remove the individual tiles. Take care here not to cut through any studs.
Find the tub flange. Remove the screws that attach the flange to the studs in the wall. At this point, the tub should be freed from the wall.
Once you’ve removed the flange, use a utility knife to cut away the caulk between the tub and the floor. When this is done, you should be able to lift the tub up and out of the alcove. Keep in mind that, depending on what it’s made of, the old tub could be tremendously heavy. You should plan to have a friend help you move it just in case.
Install the New Tub
Before you make any adjustments to the area, place the new tub in the alcove to make sure it fits properly and that the tub drain lines up with the P-trap underneath the floor.
Remove it and install a 2 x 4 ledger board. Measure the tub’s flange, then mark that height on the wall. Screw the ledger board to studs in the wall. This will help to support the weight of the tub.
Once the ledger board has been installed, go ahead and secure the drain to the tub. For this step, you’ll need some plumber’s putty. Roll a small amount of putty in your hands and wrap it around the underside of the drain flange. Push the drain into the tub from underneath the tub.
When the drain has been attached, connect the overflow drain. To do this, you’ll place the gasket on the overflow elbow and move it behind the tub. Once that’s on, connect the overflow pipe and the drainpipe, but take care not to overtighten.
Secure the Tub
After the connections are in, it’s time to set the tub in place. Before you start, make sure the flange lines up with the markings you made in Step 4. Because the ledger board holds the tub in place, it’s important that it matches up. If not, you’ll need to remove it and readjust.
Once your measurements line up, attach the flange to the studs on all three sides of the wall. Please note that you should not screw the flange to the wall. Instead, you should use roofing nails because they won’t rust over time. When the tub is in place, install the baseboard and the molding in front of and around the tub.
Repair and finish off the drywall or tile that you cut in Step 3. If you’re installing a fiberglass bath surround, now’s the time to adhere it to the alcove.
Then, enjoy your tub! While all these steps might seem intimidating, removing and installing a new bathtub is a relatively easy DIY project that can be completed in a single day. And now, when you settle in for your next bubbly soak, you can enjoy your bath without the distraction of a tub in disrepair.
https://www.homeserve.com/en-us/blog/how-to/bathtub-replacement/
I found that blog post on A Step-by-Step Guide to Installing a Bathtub while exploring the web. Sharing is caring. Who knows, you might be helping someone out. Thank-you for going through it.
Need Help? Hire Us Now!